Bilton Industrial Estate

 
4Prop Research
Dec 31, 2009 eye icon240

The original part of the estate was constructed in the 1980s and these units comprise steel portal frames with brick elevations to the lower levels and profile steel cladding above.The buildings built in 2008 are set within a contemporary, landscaped environment with generous loading and parking provisions.