Sirft Sheffield International Rail Freight Terminal
4Prop Research
Dec 31, 2009
241
The development comprises two high bay distribution facilities constructed to an institutional specification to the highest standards and with quality finishes. The units share two dedicated secure 420 metre long rail sidings set flush with the rear yard to allow direct fork lift access. Unit 1 also benefits from a private turn out facilitatingdirect rail access into the building.Building 1 – 1350 KVa electrical capacityBuilding 2 – 1200 KVa electrical capacity
written by